Temporary Private 5G and LTE Coverage Without Building a Mast

Spectrum has stopped being the hard part. In the US a private 5G network runs on CBRS spectrum, coordinated through a Spectrum Access System. The radio still has to stand somewhere: 20 feet up, powered, secured, and gone again when the project ends. A Mobile Tower Platform carries the radio, the antenna, the backhaul and the power supply on one base, standing in under 15 minutes with no groundwork and no grid connection.

Radio at 20 ft, or 30 ft

Height you can move, not height you build

On air in 15 minutes

No groundwork, no grid connection

130 lbs mast top payload

Radio, antenna and backhaul on one head

CE by TUV Rheinland

95 pages of test documentation

The Spectrum Is Available. The Site Is the Constraint.

Spectrum is no longer the bottleneck. In the US the CBRS band at 3550 to 3700 MHz is open to private networks: General Authorized Access requires no license and is coordinated through a Spectrum Access System, and Priority Access Licenses are held per county. That part can be planned.

The location cannot. A temporary site has no structure, no power and nothing you are allowed to bolt into. Mid band radio is close to line of sight, so every foot of antenna height is coverage gained, and every foot given up has to be bought back with another cell. A radio strapped to a fence post or a container roof gives neither the height nor a position that can be reproduced next week when the container moves.

A temporary network also has to be removed again. A permanent mast means a permit application, a foundation and a civil works bill for coverage that already has an end date. A Mobile Tower Platform is a mounting point that arrives on a truck, stands where the coverage plan puts it, and goes back on the truck when the project closes.

Common applications:

  • Event and festival capacity
  • Construction and infrastructure sites
  • Outage response and disaster recovery

What the Platform Contributes to a Temporary Private 5G Network

Height Is the Cheapest Gain in the Link Budget

Everything else in a private 5G network costs money to improve. Antenna height costs a mast. The four spoke top carries the radio unit and the antenna at 20 feet, or 30 feet on the MSB-Premium XL, clear of the vehicles, cabins and stacked material that decide what a mid band cell actually reaches.

Radio, Core and Backhaul Live in the Same Locked Box

A private LTE network on a temporary site puts an edge core, a router and a battery bank somewhere unattended, often behind nothing more than a fence that will be moved on Friday. The galvanized cabinet takes them, and it cannot be climbed or opened at ground level.

A Cell That Never Sleeps Is a Power Budget

A camera can idle between events. A base station cannot, and neither can the core behind it. Continuous transmit draws a load that the site has to carry for the whole deployment, which is why power belongs in the platform choice rather than in the second site visit.

Your Radio Changes Per Project. The Platform Should Not.

The platform ships as a shell: no radios, no antennas, no electronics. Whichever vendor wins this tender mounts on the same pre-drilled points as the last one, without welding, without modification and without a second trip for a bracket that does not fit.

Temporary Sites, at the Scale a Network Rollout Runs At

These deployments carried surveillance payloads rather than radios. The part that transfers is the logistics: how many platforms go up in a week, how far apart they stand, and what keeps them running once the trucks have left.

Mobile security tower with a camera among football fans at UEFA EURO 2024

159 platforms across 21 venues, inside a single week

Wilson James | United Kingdom

The XXII Commonwealth Games gave Wilson James a fixed date and 21 venues with no permanent infrastructure of any kind. 159 platforms went in inside one week, feeding analytics and a central monitoring position. Any temporary network faces the same three constraints on the same kind of site: a deadline that will not move, locations that have nothing to mount on, and a build window measured in days.

Units deployed
159
Venues covered
21
Installation window
Under one week
Permanent works
None

Common questions about temporary private 5G and LTE deployments

Spectrum, permits, antenna height and power: the four questions that decide whether a temporary network stands up on time.

In the US, the CBRS band at 3550 to 3700 MHz is the usual route for a private network. General Authorized Access needs no license and is coordinated through an approved Spectrum Access System, which assigns channels and protects incumbent users. Priority Access Licenses give protected spectrum and are held per county. Rules, coordination and equipment certification differ per band and per deployment, so confirm the requirement with your SAS provider or integrator before committing to a date.

No. TelescopicMast supplies the platform and the mast, nothing else: no radios, no antennas, no backhaul and no core. The equipment on a network site changes per project and per tender, so the platform stays neutral. Buyers typically save 15 to 20 percent compared with a pre-equipped tower, and the electronics are upgraded several times over the life of the steel.

There is no single number, and anyone offering one has not seen your site. Mid band spectrum around 3.5 to 3.8 GHz behaves close to line of sight, so the answer comes out of a link budget for your band, your target area and whatever is standing between the two. What is consistent is the direction of travel: clearing the vehicles, cabins, containers and stacked material that live at ground level is worth more than most other adjustments you can make on the day. The MSB6 range gives 20 feet, the MSB-Premium XL gives 30 feet, and both put the radio and the antenna in the same place at the top.

Usually less than for a permanent structure, because the platform is a vehicle or a movable object rather than a fixed installation with a foundation. That is a large part of why temporary networks use them. It is not a blanket exemption though: national rules, local rules, deployment duration, height and the site owner all come into it, and a 30 ft mast is treated differently from a 20 ft one in some jurisdictions. Check the specific location and duration before you plan the rollout around it.

That depends on what you mount, and the honest starting point is a power budget rather than a brochure figure. A base station and an edge core transmit continuously, which is a very different load from a camera that wakes on an event, so numbers borrowed from surveillance deployments will mislead you. The cabinet takes your own batteries and hydrogen or methanol fuel cells, the MSB-Edge carries three 220 W panels for 660 W of solar, and grid, solar and hybrid configurations are all supported. Typical stand time on a single site across all applications is six months to three years.

Yes, and on a temporary site that is often the business case. The four spoke mast top takes 130 lbs, the mast offers several mounting levels, and one base means one power supply, one set of site permissions and one thing to collect at the end. A construction site that needs a private LTE network for its equipment and its site systems generally needs surveillance on the same plot, and paying twice for two masts is a decision worth revisiting.

Receive personal advice

Our team of experts is ready to help you find the right solution for your mission. Please fill out the form below, and we will get back to you as soon as possible.

Gawain Guedry
Gawain Guedry
Director, North American Sales and Operations

Get in touch

Have questions about our Mobile Tower Platforms? Our sales team is ready to help you find the perfect solution for your mission needs.